Fire Station Committee reviews expanded concept designs and space plan
Boxborough Fire Station Committee reviews multiple design concepts and space needs. Vice Chair Mac Reid led the committee's June 11 review of three to four architectural schemes from Context, following a June 4 public visioning session that favored vernacular architecture and gabled roofs. The
Fire Station Building Committee · Meeting of June 11, 2026
Boxborough Fire Station Committee reviews multiple design concepts and space needs. Vice Chair Mac Reid led the committee's June 11 review of three to four architectural schemes from Context, following a June 4 public visioning session that favored vernacular architecture and gabled roofs. The revised space-needs assessment shows seven bedrooms within a 20,000-square-foot building to accommodate on-call firefighters during day and night hours.
Town Administrator Mike Johns reported the property closing is delayed to July pending title review and confirmation of access rights to Route 111 via Sara's Way. A second visioning session is planned for July 23 during Fifer's Day.
In the full story:
- The complete report — 270 words
Source: the Fire Station Building Committee meeting of June 11, 2026, compiled from the official minutes.
Members read the rest of this story and every Boxborough meeting we cover, in full.
Become a memberAlready a member? Sign inA 30-day free trial needs a payment method. After it, your membership renews at the price shown at checkout until you cancel, which you can do anytime from your account. Subscription terms
Share this brief
Know someone in Boxborough who follows town government? Share Townbrief Boxborough: they can sign up free.